Marbella is taking another important step towards connecting its coastline with the development of a new section of the Senda Litoral in the east of the municipality. The project, located between La Morera and Bahía de Marbella, will improve access to the beach while also restoring an important dune ecosystem.
The new project represents another milestone in Marbella's long-term ambition to create a more continuous coastal route, providing residents, visitors and property owners with improved access to some of the municipality's most attractive beaches and natural areas.
A New Coastal Path for East Marbella
The planned section of the Senda Litoral Marbella will be situated in the Los Monteros area, connecting the car park on Calle Realejo, close to the La Morera residential development, with the western roundabout of Bahía de Marbella.
The new route will extend for approximately 260 metres and will include a bridge crossing the Arroyo Realejo. The project is designed not only to make the coastline easier to access but also to improve the surrounding environment.
According to the project information, the works include a three-metre-wide wooden walkway, a 32-metre wooden bridge, improved beach access, lighting, benches, bins, signage and a public toilet facility.
The works were put out to tender with a base budget of approximately €863,547, while the wider project has been reported as costing just over €1 million. The planned construction period is four months.
Where Will the New Senda Litoral Section Be?
The route will run:
La Morera → Arroyo Realejo → Bahía de Marbella
This is particularly significant because much of Marbella's existing seafront walking infrastructure is concentrated around the town centre and western areas. The new eastern sections are intended to gradually close this gap and ultimately help connect Marbella's coastline with neighbouring Mijas.
Environmental Improvements to La Adelfa Dunes
One of the most interesting aspects of the project is that it goes beyond simply constructing a new promenade.
The works will include the restoration of the La Adelfa dune system, which forms part of Marbella's protected ecological dune reserve.
The project aims to reduce pressure on the dunes by controlling access and directing visitors towards designated walkways. Fencing and information panels will also help protect sensitive areas.
Native dune vegetation will be replanted to help stabilise the dunes and restore their natural character. Invasive vegetation will also be removed as part of the environmental works.
This combination of improved public access and environmental protection is an important feature of the development. Rather than encouraging unrestricted access to fragile coastal areas, the new infrastructure is designed to guide visitors while helping preserve the natural landscape.
Easier Access to Marbella's Beaches
The new coastal path will also improve access between residential areas and the beach.
The project includes upgrades to existing beach access routes, as well as dedicated access for maintenance and emergency services. A drinking-water pipeline will also be installed along the route, allowing for potential future beach facilities such as showers or drinking fountains.
For people living in or owning property around Los Monteros, La Morera and Bahía de Marbella, this could make walking and cycling along the coast considerably more convenient.
Part of a Bigger Senda Litoral Marbella Project
The new eastern section should be viewed as part of a much larger vision for Marbella's coastline.
The municipality has been progressively developing different sections of its coastal path, with the long-term objective of creating a more connected route along the Marbella coastline.
In July 2026, the town completed another section in Bahía de Marbella, Las Chapas, installing a 30-metre pedestrian footbridge together with public toilet and lifeguard facilities. The new work connected the existing path with the roundabout near the beach at the end of Avenida Príncipe.
Further improvements have also been made to the coastal infrastructure around the Dunas de Artola, where 1,250 square metres of walkway were renovated to improve safety and protect the sensitive natural environment.
Together, these projects demonstrate the continued investment being made in Marbella's coastline.
What Does This Mean for Property in East Marbella?
The continued expansion of the Senda Litoral could be particularly interesting for the East Marbella property market.
Areas such as Los Monteros, Bahía de Marbella, Las Chapas and La Morera are already popular with buyers looking for properties close to the beach. Better pedestrian connections can make these areas even more attractive to residents, holiday-home owners and international buyers.
For property purchasers, proximity to amenities and beaches is often an important consideration. A more connected coastal path can provide an additional lifestyle benefit, allowing residents to enjoy the coastline without relying on a car for every journey.
It also reinforces one of Marbella's strongest selling points: the combination of luxury property, Mediterranean beaches, outdoor living and high-quality infrastructure.
A More Connected Marbella Coastline
The ultimate ambition is much bigger than this 260-metre section.
Marbella's eastern coastal path is expected to develop progressively, with the intention of eventually linking existing and future sections towards neighbouring municipalities, including Mijas.
That could create an increasingly extensive coastal route for walking, running, cycling and enjoying the Mediterranean landscape.
For Marbella, this means improved connectivity. For residents, it means better access to the beach. And for visitors and property owners, it adds another major lifestyle attraction to an already highly desirable part of the Costa del Sol.
When Will Construction Begin?
The project was officially put out to tender in July 2026, with companies invited to submit offers by 26 August 2026. As of the latest available information at the beginning of September, the contract had not yet been publicly awarded, so a confirmed construction start date should not be assumed.
Once construction begins, the planned execution period is four months.
Why This Matters for Marbella
The new Senda Litoral section represents more than another stretch of promenade.
It combines three important priorities for Marbella:
- Improved coastal connectivity
- Better access to the beach
- Protection and restoration of the natural dune environment
With further sections planned or under development, Marbella is steadily moving towards a more connected coastline where residents and visitors can enjoy the Mediterranean landscape while sensitive natural areas receive greater protection.
For anyone considering buying property in Marbella, particularly in East Marbella, developments such as this are worth watching. Infrastructure improvements, enhanced beach access and investment in public spaces can all contribute to the long-term appeal of an area.
